Luchai Dog Training Lead Leash, 10m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Red) 1count Red
Luchai Dog Training Lead Leash, 10m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Red)
Description
Features:
- Leash Size:10M/32Feet*2CM
- Well made Training Leash:Its made of strong nylon with durable metal Buckle, the 29 cm D-ring cushioned handle is firm comfortable hold, works well if you want to tie if off or clip it to your waist, Suitable for trainers.
- Swivel-style Stainless Steel Buckle:The dog lead comes with a Swivel-style Buckle for easy to attach to your dogs collar, rotated by 360 degree secure your pet to play in any way safely.
- Long Lead: The 10meters/32Feet long dog lead is used for train the re-call of your dog, Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming.
- Dear Customers, We are seller JORMUD-EU, recently there are unauthorized sellers who sell under our listing, they are not FBA seller. They delivery the goods outside UK, which cause more than 45 days, you might probably receive very low quality or even totally different products, or they even do not delivery. If you accidental buy from those unauthorized sellers and meet the above problem, please contact us for any new replacement or refund.
Tags:petsuk
Title - Default Title
Guardian Fall Protection 10786 Premium 4-Foot Cross-Arm Straps with Large and Small D-Rings 4 ft
Guardian Fall Protection 15159 GRG-Guardrail Gusset
Guardian Fall Protection 210 Railmast Pin Assembly Replacement
Guardian G1540BA Eyewash Additive for Aquaguard Gravity-Flow Portable Eyewash, 8 oz.
Guardian Gear Oster 076300-103-005 Blade Wash Liquid Blade Dip, 18 oz
Guardian Peace and Flowers Motorcycle Biker Luck Gremlin Riding Bell or Key Ring
Guardian Ride It Like You Stole It Motorcycle Biker Luck Gremlin Riding Bell or Key Ring
Guardian Sheriff Motorcycle Biker Luck Gremlin Riding Bell or Key Ring
Guardian® Praying Hands with Rosary and Holy Cross Motorcycle Biker Luck Gremlin Riding Bell 1
Guardians
Mack’s Keychain Carrying Case, Aluminum, Waterproof Ear Plugs Holder – 2 Pack (Pink) Pink
Mack’s Snore Blockers Soft Foam Earplugs, 12 Pair – 32 dB High NRR – Comfortable Ear Plugs for Sleeping, Snoring, Loud Noise and Travel
Macl 2Pcs Car Headrest Mount Holder for Tablets, 360°Rotating Universal Tablet Holder, Tablet Car Holder with Adjustable Headrest Strap & Anti-Slip Silicone Holding Clamp, Fits 7-10.5 inch Tablets
Macl Car Headrest Mount Holder for Tablets, 360°Rotating Universal Tablet Holder, Tablet Car Holder with Adjustable Headrest Strap & Anti-Slip Silicone Holding Clamp, Fits All 7-10.5 inch Tablets 1PCS
Maclocks CL15UTL Universal Tablet Lock Adhesive Security Plate with Security Slot & 6-Foot Cable Lock (Silver)
Maclocks MMEN76 Mac Mini Security Mount Enclosure (Silver)
MACO Black File Folder Labels, 9/16 x 3-7/16 Inches, 248 Per Box (FF-L8)
MACO Coral File Folder Labels, 9/16 x 3-7/16 Inches, 248 Per Box (FF-L11)